Request a Quote
Case Study

Alcoa Peel Regional Office (Pinjarra)

Alcoa employs more than 3,750 people in WA, about 2000 of which live in the Peel region, who work in support functions including human resources, finance, procurement and facilities management.
Image-Alcoa Peel Regional Office (Pinjarra)-469

Designed by architectural firm Hames Sharley and built by Pindan Constructions, Alcoa’s Peel regional headquarters set a new benchmark in leading-edge office design for the Pinjarra area when it was opened in 2008. In line with Alcoa’s global commitment to sustainability, the building maintains a 4.5-star national energy rating.

Image-Alcoa Peel Regional Office (Pinjarra)-971

Why Transition To Solar Energy?

Apart from the benefits of combating greenhouse gas emissions and reducing their dependence on fossil fuel to run their business, Alcoa wanted to reduce their electricity costs.

Our Solution

Alcoa Peel Regional Office (Pinjarra)
Location: 6208/808 Pinjarra Rd, Pinjarra WA 6208
Date Installed: January 2020
System Size: 80kw Solar System
Inverter Size: 60kw
Solar Products: 3 x Fronius Symo 20kw Inverters + 242 x 330w Jinko Solar Panels

View Our Commercial Solar Products:

Apart from the benefits of combating greenhouse gas emissions and reducing their dependence on fossil fuel to run their business, Alcoa wanted to reduce their electricity costs.

Other Projects

Get a free quote today

Image-Alcoa Peel Regional Office (Pinjarra)-359
Get a fast, free quote or no-obligation on-site assessment to help you choose the right system to suit your home or business.

Fields marked with * are required.

Drop files here or
Accepted file types: jpg, png, pdf, words, Max. file size: 5 MB.
Image-Alcoa Peel Regional Office (Pinjarra)-392